Work continues to repair damaged bridge on I-59 in Hattiesburg - WDAM - TV 7 - News, Weather and Sports

Work continues to repair damaged bridge on I-59 in Hattiesburg

Posted: Updated:
HATTIESBURG, MS (WDAM) -

Work to repair structural damage to an I-59 bridge in Hattiesburg is expected to take at least three more weeks.

The work has forced the closure of the right lane of the southbound lanes on I-59 from the Bouie River bridge to exit 67-A at Highway 49. The off ramp at 67-A toward Highway 49 south is also closed. The bridge was damaged when a track hoe being carried by a flat bed trailer crashed into the facing and got wedged. 

While the work to repair the damage continues the right lane on I-59 and the Exit 67-A off ramp will remain closed. Because of the high volume of traffic during the day, M-DOT officials say most of the work on the bridge is being done at night. Target date to get them back open is around the first of September.

Copyright 2014 WDAM. All rights reserved.